Location of performance / Site: | Tuningen, Baden-Wuerttemberg, Germany, Europe |
---|---|
Period: | Jul 2012 - Jul 2014 |
Design and tendering tor Rehabilitation of the surface waler drainage system below the lal1dfill base by injecting gravel by air (Iength 750 m), conslruction cf a concrete leachate shaft (ON 2,500), construction of leachate pipes